# Engineering Planning and Design Consultants | Kimley-Horn

> Markdown mirror of DialtoneApp's public top-site detail page for `kimley-horn.com`.

URL: https://dialtoneapp.com/top-sites/kimley-horn.com/index.md
Canonical HTML: https://dialtoneapp.com/top-sites/kimley-horn.com

## Summary

- Domain: `kimley-horn.com`
- Website: https://kimley-horn.com
- Description: ai readable | score 16 | purchase read only
- Label: ai_readable
- Payment surface: Not available
- Purchase boundary: read_only
- Control boundary: unknown
- Rank: 165367

## robots

~~~text
Crawl-delay: 10
# START YOAST BLOCK
# ---------------------------
User-agent: *
Disallow:

Sitemap: https://khwebsite.wpenginepowered.com/sitemap_index.xml
# ---------------------------
# END YOAST BLOCK
~~~

## llms

~~~text
Generated by Yoast SEO v26.5, this is an llms.txt file, meant for consumption by LLMs.

The XML sitemap of this website can be found by following [this link](https://www.kimley-horn.com/sitemap_index.xml).

# Kimley\-Horn: Expect More\. Experience Better\.

> Learn more about Kimley\-Horn, one of the nation's premier engineering, planning, and design consultants dedicated to the continuing success of our clients\.

## Pages
- [Entry\-Level](https://www.kimley-horn.com/careers/entry-level/)
- [Careers](https://www.kimley-horn.com/careers/)
- [Home](https://www.kimley-horn.com/)
- [Responsibility Report](https://www.kimley-horn.com/responsibility-report/)
- [Community Involvement](https://www.kimley-horn.com/about-us/community-involvement/)

## Posts
- [\<b\>Celebrating Earth Day:\</b\> Our Commitment to Sustainable Infrastructure Solutions](https://www.kimley-horn.com/news-insights/kimley-horn-corner/celebrating-earth-day-sustainable-infrastructure-solutions/)
- [2026 APA \<b\>National Planning Conference \</b\>](https://www.kimley-horn.com/news-insights/events/2026-apa-national-planning-conference/)
- [Kimley\-Horn Acquires \<b\>Gamble Design Collaborative\</b\>\<br\>\<i\>\<h1 style="font\-size: 1\.75rem;"\>Acquisition strengthens the firm's master planning, landscape architecture, and entitlement capabilities in one of the Southeast's fastest\-growing markets\</br\>\</i\>\</h1\>](https://www.kimley-horn.com/news-insights/media-mentions/gamble-design-collaborative/)
- [\<b\>2026 NASTT\</b\> No Dig](https://www.kimley-horn.com/news-insights/events/nastt-no-dig-2026/)
- [Innovative City of Burleson Project Seeks to \<b\>Expand ADA Accessibility with Robotics\</b\>](https://www.kimley-horn.com/news-insights/media-mentions/innovative-city-of-burleson-project-seeks-to-expand-ada-accessibility-with-robotics/)

## Locations
- [St\. Louis Park](https://www.kimley-horn.com/location/st-louis-park/)
- [Cumming](https://www.kimley-horn.com/location/cumming-ga/)
- [Albuquerque](https://www.kimley-horn.com/location/albuquerque-nm/)
- [Fort Worth South](https://www.kimley-horn.com/location/fort-worth-south-tx/)
- [Doral](https://www.kimley-horn.com/location/doral-fl/)

## Markets
- [Energy](https://www.kimley-horn.com/markets/energy/)
- [Residential](https://www.kimley-horn.com/markets/residential/)
- [Roadway \& Bridge](https://www.kimley-horn.com/markets/transportation/roadway-bridge/)
- [Coasts \& Waterfronts](https://www.kimley-horn.com/markets/coasts-waterfronts/)
- [Aviation \& Aerospace](https://www.kimley-horn.com/markets/aviation-aerospace/)

## Projects
- [Cultivating Phase 1 of the \<strong\>Marie Selby Botanical Gardens\</strong\>](https://www.kimley-horn.com/project/cultivating-phase-1-marie-selby-botanical-gardens/)
- [The Everett Link Extension: Setting the Stage for \<strong\>Greater Connectivity Across Seattle\</strong\>](https://www.kimley-horn.com/project/everett-link-extension-greater-connectivity-across-seattle/)
- [Revitalizing the Historic Downtown Streetscape at \<strong\>Greer Station\</strong\>](https://www.kimley-horn.com/project/downtown-streetscape-at-greer-station/)
- [\<b\>650 Main:\</b\> Creating a Dynamic Gathering Place in Salt Lake City](https://www.kimley-horn.com/project/650-main-dynamic-gathering-place-salt-lake-city/)
- [AREA\<strong\>15\</strong\>](https://www.kimley-horn.com/project/area15/)

## Services
- [Design \& Engineering](https://www.kimley-horn.com/services/design-engineering/)
- [Structural Engineering](https://www.kimley-horn.com/services/design-engineering/structural-engineering/)
- [Tolling Systems \& Managed Lanes](https://www.kimley-horn.com/services/transportation/managed-lanes-tolling-systems/)
- [Strategic Communications \& Outreach](https://www.kimley-horn.com/services/planning-due-diligence/strategic-communications-outreach/)
- [Development Services](https://www.kimley-horn.com/services/development-services/)

## Team
- [Raj Paradkar](https://www.kimley-horn.com/team/raj-paradkar/)
- [Brian Shaw](https://www.kimley-horn.com/team/brian-shaw/)
- [Patrick Tichenor](https://www.kimley-horn.com/team/patrick-tichenor/)
- [Sheila Preble](https://www.kimley-horn.com/team/sheila-preble/)
- [Erik Mumm](https://www.kimley-horn.com/team/erik-mumm/)
~~~

## llms-full

Not found.